After being certified as a Green Community in 2010, the town of Acton applied for and received funding from the state each year after that. Here’s a partial list of projects:

  • Funding energy conservation measures and lighting upgrades at the Memorial Library
  • An HVAC analysis of Town Hall and installation of a tankless hot water heater and vending misers
  • Lighting retrofits with LED technology at the Public Safety Facility building and Davis Memorial
  • An energy education outreach program in the Acton-Boxborough Regional School District.
  • Installation of demand controls in the RJ Grey School.
  • Ventilation, resetting the unit ventilator controls, air sealing with caulking, and re-commissioning of boiler and rooftop unit; and air sealing with caulking at Conant, Douglas, Gates Elementary schools and the Administration building.
  • Funding additional energy conservation measures in the Memorial Library and five schools.
Acton’s Green Communities projects

Leave a Reply

Your email address will not be published. Required fields are marked *